Une partie de la route 138 sera fermée à la hauteur de la route 207 lundi, 10 septembre, de 21h à 5h en raison de travaux d’inspection.
Le Conseil de bande de Kahnawake l’a annoncé vendredi sur son site internet.
Route 138 partial closure over 207 Monday
(Press release) The Mohawk Council of Kahnawà:ke has been informed by the Ministère des Transport du Quebec that a section of the Route 138 will
be partially closed Monday, September 10th from 9pm to 5am for inspections.
The work will take place on the portion of Route 138 directly above the Route 207 underpass. Both access ramps from the 207 and the right
lane in both directions of the 138 will be closed. Traffic will use the left lanes in both directions.
The MCK reminds the public that these works are subject to change due to weather conditions, operational constraints or work progression
and that it does not take part in the scheduling or cancellation of such works.
